Work of Excellence

OUR PROJECTS

Windy Apparels LTD
WINDY APPARELS LTD

We are installing one of our most innovative projects in Windy Apparels LTD a fully equipped MBR with ZLD plan with a capacity of 350 m3/hr . Located at Pagar, Tongi.

Jamuna Poly Silk LTD
JAMUNA POLY SILK LTD

Expanding our foot-print beyond Dhaka, This is one of our prestigious MBBR Projects with a capacity of 90 m3/hr fueling our commitments to operational excellence Location: Hobiganj, Sylhet. 

 

MAZ Textiles Ltd
MAZ TEXTILES LTD

We are currently installing an conventional biological plant with a capacity of 100 m3 /hr in Jamalpur Economic Zone.

SAM REE Dying
SAM REE DYING

Trusted by our industry partners, this project is a testament to our conviction. An activated Sludge Process fully PLC based Biological ETP with a Capacity of 300 m3/hr. Location: Ghorar Shal, Narshindi.

Nipa Washing Plant
NIPA WASHING PLANT

With a growing team of environmental engineers, We have commissioned and installed an conventional bio-chemical plant for Nipa washing Plant with a capacity of 50 m3/hr. Location: Dakkhin Khan, Tongi

JL Fashion Ltd
JL FASHION LTD

Our successful venture to install an Physio- Chemical Plant with a Capacity of 20 m3/hr in Gazipur.

Standard Group
STANDARD GROUP

Wehave commissioned and installed most prestigious and giant project for standard group's 15 m3/hr etp plant in masterbari, gazipur. It was a success story of minimum costing & properly running & met all require standard parameter for buyer & department of environment.

Mnr Design Ltd.
MNR DESIGN LTD.

Wehavesuccessfully installed & Commissioned Of 15 m3/hr ETP Plant for MNR Design Ltd. Location Of Sreepur, Gazipur, it was properly running & it was met all require standard Parameter for buyer & Department Of Environment.

Deshbondhu Group
DESHBONDHU GROUP

This is an inspired storyfor us , wehave installed & commissioned of 60 m3/hr etp plant for Deshbondhu Group. Location of company Nilphamary, EPZ. It was properly running & met all require standard parameter for buyer & department of environment .

Virgo Fish & Agro Process Ltd.
VIRGO FISH & AGRO PROCESS LTD.

Our company most modern etp plantof 15 m3/hr have installed & commissioned for virgo fish & agro process ltd. Company location trishal, mymensingh, it was properly running & met all requirement standard parameter for buyer & department of environment.

Natural Wool Wears Ltd.
NATURAL WOOL WEARS LTD.

These are the success story of most modern ETP plant 15 m3/hr have installed & Commissioned for NATURAL WOOL WEARS LTD. Location of company-Bangabandhu Road, Charabagh, Ashulia, Savar, Dhaka.

Pretty Sweater Ltd.
PRETTY SWEATER LTD.

Wehave successfully installed & Commissioned Of 25 m3/hr ETP With UF system Plant for Pretty Sweater Ltd (PSL) It is a sister concern of Pretty Group.

Kojima Lyric Garments
KOJIMA LYRIC GARMENTS

We have successfully installed & Commissioned Central Drinking water treatment plant for Kojima Lyric Garments, Company Location-Jaydep pur, Gazipur.

Natural Sweater Village Ltd.
NATURAL SWEATER VILLAGE LTD.

MostmodernETP plant of 15 m3/hrhave installed & Commissioned for Natural Sweater Village Ltd. It is a sister concern of Natural Group. it was properly running & met all requirement standard Parameter for buyer & Department Of Environment.

Heidelberg Cement Bangladesh Ltd.
HEIDELBERG CEMENT BANGLADESH LTD.

Wehave commissionedandinstalledWater treatment Plant for Heidelberg Cement Bangladesh Limited, Company Location Chittagong.

IRIS Fashions Limited
IRIS FASHIONS LIMITED

Theseare the successstory ofmost modern ETP plant 15 m3/hr have installed & Com missioned for IRIS Fashions Limited (Sweater Unit). Company Location-Zerabo, Ashuliya

CP Bangladesh Co. Ltd
CP BANGLADESH CO. LTD

We have successfully installed & Commissioned Of 10 m3/hr Reverse Osmosis Plant for C.P Bangladesh Co. Ltd (Chittagong Feed Mill), Company location-Mirershorai, Chittagong.

T-Desing Knit wear Ltd.
T-DESING KNIT WEAR LTD.

Another 15m3/hr ETPPlant have installed & Commissioned for T-Desing Knit wear Ltd. Company Location-Mawna, gorgoriya muster bari, Gazipur.

Unicorn sweater Limited.
UNICORN SWEATER LIMITED.

We have successfully installed & Commissioned Of 5.0 m3/hr Central drinking system for Unicorn sweater Limited. Company Location-Jamgora, Ashulia, Savar.

Nipa Group
NIPA GROUP

These are the success story of installed & Commissioned 50 m3/hr Water Treatment Plant (Iron Removed and Softener Plant) for Nipa Group. Company Location-Dhokhin Khan, Khachpura, Uttara

Nipa Group
NIPA GROUP

Another 50 m3/hr ETP Plant successfully installed & Commissioned for Nipa Group. Company Location-Dhokhin Khan, Khachpura, Uttara. 

 

Diganta Sweaters Ltd.
DIGANTA SWEATERS LTD.

Wehavesuccessfullyinstalled & Commissioned Of 15 m3/hr ETP Plant for Diganta Sweaters Ltd. Company Location in Naoujoor, Tangail Road, Chandana, Gazipur. 

 

Zon Ron Sweaters Limited
ZON RON SWEATERS LIMITED

Theseare the success story of most modern ETP plant 15 m3/hr have installed & Commissioned for Zan Ron Sweaters Limited. Company Location in Nischintopur Bus Stand, Ashulia,Savar. 

 

MASAFI Group
MASAFI GROUP

These are the success story of installed & Commissioned 20 m3/hr Water Treatment Plant with RO system for MASAFI Group. Company Location-Hatu Bhanga Road, Gorai, Mirzapur.